A detailed list of projects reported in 2005/2006 is provided on the List of Projects Reported in 2005/2006
For the Complete Indicator Data Table, please download the pdf (148KB), pdf (20KB) and pdf (144KB).

INDICATOR DESCRIPTION TARGET 2005/2006
PERFORMANCE
2004/2005
PERFORMANCE
2003/2004
PERFORMANCE
2002/2003
PERFORMANCE
1 Urban
Water Cycle Management (see page 32)
Percentage reduction in water consumption compared to the base case. 40%
2008
37% 43% 31% 22%
   Percentage reduction in the mean annual load of total nitrogen (TN). 45%
2008
35% 21% 19% 15%
   Percentage reduction in the mean annual load of total phosphorus (TP). 45%
2008
45% 38% 33% 26%
   Percentage reduction in the mean annual load of total suspended solids (TSS). 80%
2008
59% 48% 45% No data
2 Moderate Income Housing
(see page 37)
Percentage of total yield (lots, house/land packages, dwelling units) that is delivered within the moderate income housing range. 7.5%
2008
6.2% 12% 7% 3%
3 Effectiveness of Community Consultation
(see page 42)
Percentage of Landcom projects where community consultation was done using a stakeholder consultation plan in accordance with Landcom’s Stakeholder Consultation Workbook. 100%
2005
100% 83% 55.6% 16.7%
4 Community Facilities
(see page 37)
Number of school sites provided. NA 0 2 3 0
  Number of courts for playing sport delivered (e.g. tennis, basketball, multi-purpose sport, etc). NA 1 1 6 8
  Number of community halls or community hall sites provided. NA 0 0 2 9
  Number of playgrounds provided. NA 2 3 4 10
5 Welcome Programme
(see page 37)
Percentage of projects with more than 200 homesites that had a Welcome Programme. 100%
2008
70% 62% 55% 40%
  Percentage of households that had a Welcome Programme visit within 2 weeks of home occupation. 100%
2008
60% 64% 96% 20%
6 Consumer Education on Sustainable Living
(see page 42)
Percentage of projects that have marketing material that includes consumer education on sustainable living. 100%
2008
0 0 17%
(2 out of 12 projects)
0%
7 Reuse and Recycling of Construction and Demolition Materials
(see page 33)
Percentage of recovery (reuse and recycle) of total construction and demolition waste materials generated from civil works contracts delivered in that year. 95%
2006
98% 92% 96% 93%
Percentage of recovery (reuse and recycle) of total construction and demolition waste materials generated from building construction projects delivered in that year. 76%
2014
No data No data No data No data
8 Energy Efficiency
(see page 33)
Reduction in greenhouse gas emissions, compared with base case, as per the Energy Smart Communities Policy. 40%
2008
14.5% 15.5% 10% 6.6%
9 Influencing Design
(see page 38)
Percentage of projects where Landcom influences the builders’ product by specifying design criteria. NA 75% (3 out of 4 projects) 86%
(6 out of 7 projects)
100%
(9 out of 9 projects)
77%
10 Sustainable or Renewable Energy Supply
(see page 34)
Percentage of dwellings fitted with gas boosted solar hot water system. 100%
2008
32% (53 out of 167) 36% (91 out of 251) 44%
(99 out of 226)
0%
Percentage of projects greater than 500 dwellings that include a component of renewable energy supply, either on-site or off-site, as per the Energy Smart Communities Policy. 100%
2008
NA
(Note 1)
100% NA NA
11 Native Vegetation Management
(see page 35)
Loss of “high conservation significance” Endangered Ecological Communities. No loss 29.4 ha cleared
119.1 conserved
14.0 ha cleared
30.9 ha conserved
0.44 ha cleared
9 ha conserved
NA
  Loss of “moderate conservation significance” Endangered Ecological Communities. No target 59.09 ha cleared 16.4 ha conserved 3.1 ha cleared
7.5 ha conserved
8 ha cleared
2.3 ha conserved
1 ha cleared
0.6 ha conserved
  Loss of “low conservation significance” Endangered Ecological Communities. No target 65.4 ha cleared
18.6 ha conserved
33.5 ha cleared
14.6 ha conserved
11.9 ha cleared
6.6 ha conserved
0.15 ha cleared4.83 ha conserved
  Area of Endangered Ecological Communities replanted. No target 29.1 ha replanted 63.3 ha 9.5 ha 10.4 ha
  Percentage of projects where Endangered Ecological Communities or Threatened Species are found that have an appropriate Vegetation Management Plan. 100%
2008
100% 100% 70% 67%
  Loss of native vegetation as potential habitat for Threatened Species. No target 201.1 ha cleared 179.5 ha conserved
(Note 2)
47.9 ha cleared
52.3 ha conserved
16.4 ha cleared
10.9 ha conserved
NA
12 Riparian Corridor Management
(see page 36)
Loss of riparian corridors for Category 1 – high significance streams. No loss NA 0% NA NA
  Greater than 40 m of riparian corridor from top of bank for Category 1 – high significance streams. 100%
2008
NA 100% NA NA
  Length of in-stream breaks resulting from Landcom’s design for Category 1 – high significance streams. No breaks NA 0 m NA NA
  20-30 m of riparian corridor from top of bank for Category 2 – moderate significance streams. 100%
2008
100% 100% 100% 100%
  Length of in-stream breaks resulting from Landcom’s design for Category 2 – moderate significance streams. No target 0 m 0 m 0 m 775 m
realignment
  5-10 m setback from top of bank for Category 3 – low significance streams. 100%
2008
100% 100% 100% 100%
  Length of in-stream breaks resulting from Landcom’s design for Category 3 – low significance streams. No target 460 m
piping
0 m 150 m
piping
0 m
  Provide appropriate Riparian Corridor Management Plans (RCMPs) for all Landcom projects where riparian land exists. 100%
2004
100% 60% 43% 50%
13 Conservation of Indigenous Heritage
(see page 38)
Percentage of projects with indigenous heritage issues where consultation occurred. 100% 100% 100% 100% 100%
  Percentage of significant indigenous heritage objects and places within Landcom projects that were conserved. 100% NA
(Note 3)
100% 100% NA
  Percentage of projects with significant indigenous heritage issues that have a Conservation Management Plan developed. 100% NA
(Note 3)
100% 100% 100%
14 Conservation of Non-indigenous Heritage
(see page 38)
Percentage of significant heritage items conserved (except where unsafe or contaminated). 100% 100% 100% 89% 100%
Percentage of significant heritage places conserved. 100% NA
(Note 3)
NA 100% 100%
  Percentage of projects with heritage listed items and places that will have a Heritage Conservation Management Plan. 100% 100% 100% 100% 100%
15 Regulatory Compliance
(see page 43)
Percentage of projects that have achieved full regulatory compliance with Protection of the Environment Operations Act and other environment, OH&S and planning legislation. 100% 73% 93% 100% 100%
  Percentage of contracts that have environmental audits carried out. 100% 45% 64% 85% 21%
   Percentage of civil environmental audit scores greater than 75%. 100% 80% 100% 100% 89%
  Percentage of builder environmental audit scores greater than 75%. 100% 11% (1 out of 9) 43% 27% 25%
  Percentage of civil environmental audit scores less than 50%. 0% 0% 0% 0% 0%
  Percentage of builder environmental audit scores less than 50%. 0% 89% 0% 31% 50%
16 Profitability
(see page 41)
Sales revenue: Revenue is the total income Landcom receives including revenue from the sale of land, profit from joint ventures, project management services and miscellaneous items. NA $317,276,000 $326,939,000 $333,253,723 $281,222,000
17 Profitability
(see page 41)
Sales margin: Sales margin is calculated as sales revenue on land sales less the total cost of developing that land divided by the sales revenue. NA 38.9% 45% 48.8% 51.2%
18 Profitability
(see page 41)
Return on sales: Return on sales is calculated as Landcom’s net operating profit after tax divided by the total revenue from the sale of land. NA 14% 19.2% 26.3% 29.5%
19 Profitability
(see page 41)
EBIT: This is calculated as Landcom’s earnings before interest and tax. NA $72,610,000 $99,315,000 $132,180,000 $127,130,000
20 Profitability
(see page 41)
Return on equity: This is calculated as the earnings after tax divided by total shareholder equity. NA 12.3% 17.2% 24.6% 26.1%
21 Profitability
(see page 41)
Return on total operating assets: This is calculated as Landcom’s profit after taxes divided by total operating assets. NA 6.4% 8.4% 15.1% 16.5%
22 Financing Capacity
(see page 41)
Debt to equity ratio – measure of the amount of debt funding (net) as a percentage of equity utilised by Landcom as at the end of the financial year. NA 18.3% 23.6% 8.0% 9.5%
23 Returns to Government
(see page 41)
Dividend and tax equivalent returned to the NSW Government during the reporting period. NA $61,738,000 $73,518,000 $87,978,000 $83,081,000
24 Returns to Government
(see page 41)
Total number of jobs created through Landcom’s activities. NA 6,050 7,868 5,270 4,470
  Total economic output generated from Landcom’s activities. NA $474,195,644 $616,675,900 $413,026,700 $350,351,900

Note 1    The relevant projects masterplanned this year were not at a stage where the component of renewable energy could be defined.
Note 2    “Habitat” includes Endangered Ecological Communities where habitat is suitable for Threatened Species.
Note 3    While consultation had occurred on projects with potential indigenous and non-indigenous heritage values, the significance of objects and places had not been finalised during the reporting period.
NA          Not applicable.

back to top